APLIKASI TEKNOLOGI PLTMH TURBIN PROPELLER OPEN FLUME SEBAGAI PEMBANGKIT LISTRIK DESA
Abstract
Berecek Village, located in Sukatani District, Purwakarta Regency, West Java Province, has a river that has not been used optimally. This community service aims to utilize the available water energy so that it can produce Micro Hydro power plants. The manufacture of a micro-hydro power plant starts from measuring water potential, designing turbines and generators, then observing the work system and estimating the electrical power that will be generated. From the survey results, it is known that the water discharge is 0.0059 m3 / s and has a fall height of 4 m. This data is used to select the type of turbine, reservoir selection, quick pipe, and generator design. The results of the manufacture of micro power plants obtained by designing using an open flume propeller turbine with a turbine rotation speed of 2063 rpm, this PLTMH is able to produce turbine power of 1346 watts with a water discharge of 45 liters / second so that the power obtained is 1076 watts.
Keywords
Full Text:
PDFReferences
Afryantima S, Syukri M 2015 Design and Development of Prototype PLTPH Using Open Flume Turbines Department of Electrical Engineering Syiah Kuala University
Amsary M A, 2017. Report on the Design of Hydroelectric Power Plants Designing Propeller Turbines Department of Energy Conversion Engineering Bandung State Polytechnic
Akhmad S, 2015. Kaplan Water Turbine Simulation on PLTMH in Sampanahan River Magalau Hulu Village Kotabaru Regency Department of Mechanical Engineering Lampung Mangkurat University
Cihanjuang Inti Teknik, 2018. Operation Guide for PLTMH Turbine Propeller Open Flume 1 kW
Dwiyanto V, 2016. Analysis of Micro Hydro Power Plants (MHP) Faculty of Engineering University of Lampung
Joni H, 2016 .Selection of Water Turbines as Generator of 3 kW in Padayo Village Lubuk Kilangan District Department of Electrical Engineering Padang State Polytechnic
Suryadi A, 2015. Electric Energy & LAB Power Plant Diktat Indorama Engineering Polytechnic Purwakarta
Suryadi A, 2017. Over frequency Relay Calibration at the Unit 1 Generator Protection System of PT. Java Bali Power Plant Cirata Generation Unit Juteks 4(1) 41-47
Suryadi A, et.al., 2017. Karakteristik Pembebanan Puncak Grid System 500 kV terhadap Arus Eksitasi Pembangkitan. Jurnal Elektra, Vol. 2, Ed. 2 : p. 42-49
Suryadi A, et.al., 2020. Design of a Prime Mover Turbine Propeller Open Flume MicroHydro Electric Power Plant 1 kW, AASEC, Universitas Pendidikan Indonesia
Wibowo H, 2015. Technical and Economic Study of Micro Hydro Power Plant (PLTMH) Planning in Lematang River Pagar Alam City
Yohannes C, 2015. Design of Load-Frequency Control Systems in PLTMH Matano East Luwu Regency Department of Electrical Engineering Faculty of Engineering Hasanuddin University
DOI: https://doi.org/10.12928/spekta.v1i2.2742